Working hours in Germany are governed by the Arbeitszeitgesetz (ArbZG), or Working Time Act. The general rule is eight hours per working day, extendable to ten when the statutory averaging conditions are met. Employers must also account for breaks, uninterrupted rest and restrictions on particular working arrangements. Einzelnorm

A contractual 40-hour week does not tell the whole story. A schedule can meet the employee’s agreed weekly hours while still creating problems through missed breaks or insufficient rest.

This guide explains the ordinary framework for adult employees and the practical checks employers and HR teams should make. Specialist sectors and protected groups may have different rules.

Normal Working Hours and Legal Limits in Germany

Contractual Hours Are Different from Statutory Maximums

There is no universal contractual 40-hour working week for every employee in Germany. Agreed hours depend on the employment terms and any applicable Tarifvertrag (collective agreement) or Betriebsvereinbarung (works agreement).

The German Working Time Act establishes protective limits. It does not automatically authorise employers to increase someone’s agreed hours.

For example, a statutory allowance for a longer working day does not itself change a 35-hour employment contract. Review the contractual basis for additional work separately.

Daily Limits, Weekly Calculations and Averaging

Under §3 ArbZG, extensions beyond eight hours must remain within the statutory daily ceiling and averaging conditions.

Measure

Ordinary framework

Contractual weekly hours

Determined by the applicable employment arrangements

General daily working time

Eight hours per Werktag

Conditional daily extension

Up to ten hours

Averaging requirement

No more than eight hours per Werktag over six calendar months or 24 weeks

The statutory Werktag framework generally includes Monday to Saturday. This produces a 48-hour average weekly framework, even though an employee may have a five-day contract.

A temporary 60-hour week may therefore be possible under the ordinary framework, but it cannot become an unchecked routine. Daily limits, averaging, rest and other applicable requirements still matter.

The EU Working Time Directive also establishes average weekly protection, including overtime. Employers should apply the relevant German rules rather than treating the directive as permission to design any schedule below a weekly total. Employment, Social Affairs and Inclusion

Comparison of agreed contractual working hours and statutory working-time limits in Germany.

Breaks and Rest Periods: Two Separate Requirements

Breaks During the Working Day

A Ruhepause is a break during work. Under §4 ArbZG, the ordinary adult requirements are:

Actual working time

Minimum statutory breaks

Up to six hours

No break required by this provision

More than six hours, up to nine hours

30 minutes

More than nine hours

45 minutes


Breaks must be determined in advance and can be divided into periods of at least 15 minutes. Employees must not work for more than six consecutive hours without a qualifying break. Einzelnorm

Ordinary rest breaks are excluded from working time. Whether a break is paid is a separate contractual or collective-agreement question.

A lunch break entered automatically into a system should reflect what actually happened. If an employee worked through lunch, the employer needs to address the missed break rather than rely on a deduction in the record.

Rest Between Working Days

Ruhezeit means the uninterrupted rest after daily work. The general requirement is at least 11 consecutive hours.

§5 ArbZG permits particular departures, including defined arrangements in certain sectors with compensatory conditions. Being busy or obtaining an employee’s agreement does not, by itself, create an exception. Einzelnorm

Check the next start time whenever work finishes late. A lawful daily total does not establish that the following morning’s shift is permissible.

How the Rules Apply to Real Work Schedules

Calculate Work Separately from Attendance

Consider an adult employee working under the ordinary framework:

  • Start: 09:00

  • Genuine break: 12:30–13:00

  • Finish: 17:30

The attendance span is eight and a half hours. Actual working time is eight hours.

By contrast, 09:00–17:00 with a 30-minute break represents seven and a half hours of work. HR should distinguish these measures when drafting schedules, reviewing records and discussing contractual hours.

These examples illustrate calculations; they do not establish compliance with every applicable requirement.

Check the Next Start Time and Any Second Job

An employee finishing at 22:00 and restarting at 08:00 has only ten hours between shifts. That fails the ordinary 11-hour rest requirement unless a lawful exception applies.

Additional employment also matters. §2 ArbZG requires hours worked for multiple employers to be added together. Eight hours in one job followed by three hours in another cannot be assessed as two unrelated working days. Einzelnorm

A practical approach is to establish how employees should report additional work relevant to scheduling. Collect the information needed to assess compliance without requesting unrelated personal details.

Schedule examples showing eight hours of work with a lunch break and an overnight rest period that is too short under the ordinary rule.

Overtime and Flexible Work Still Need Legal Checks

Separate Overtime Permission, Recording and Payment

Overtime creates three different questions:

  1. Is there a valid basis for requiring or agreeing the additional work?

  2. Does the resulting schedule meet working-time requirements?

  3. How should the additional work be remunerated or otherwise compensated?

The ArbZG does not establish a general overtime premium for every additional hour. Pay questions require assessment of applicable employment terms, collective arrangements and legal rules. §612 BGB, for example, addresses circumstances in which remuneration is implicitly agreed. Einzelnorm

Do not assume that recording overtime automatically establishes a payment entitlement, or that a salary-inclusive clause resolves every issue.

Apply the Rules to Remote Work and Flexitime

Manager discussing a flexible working schedule with a remote colleague on a video call.

Gleitzeit allows flexibility within agreed arrangements. Vertrauensarbeitszeit generally gives employees responsibility for arranging their hours. Neither removes working-time protections.

BMAS explains that working-time limits and rest requirements also apply to mobile work, including home working. bmas.de

Managers should therefore consider evening calls, work across time zones and actual start and finish times.

Business travel, Bereitschaftsdienst and Rufbereitschaft require closer classification. For on-call arrangements, restrictions on employees’ freedom can affect whether the whole period counts as working time. Payment remains a separate assessment. curia.europa.eu

Sunday, Public-Holiday and Night Work

Check Permission and Substitute Rest

§9 ArbZG generally prohibits employment on Sundays and statutory public holidays. Exceptions exist, but employers must establish the applicable legal basis and any required authorisation before scheduling work. Einzelnorm

Permission to work does not remove the need for compensatory rest. Under the general rules in §11 ArbZG:

  • Sunday work requires a substitute rest day within a two-week period that includes the Sunday worked.

  • Work on a public holiday falling on a Werktag requires a substitute rest day within an eight-week period that includes that holiday.

Applicable departures and other rest requirements must also be checked. Einzelnorm

Identify Night-Work and Special-Group Rules

Night workers have additional protections. §6 ArbZG generally uses one calendar month or four weeks for averaging an extension to ten hours, rather than the ordinary §3 reference period. Einzelnorm

Separate checks are necessary for young workers, pregnant or breastfeeding employees and specialist sectors.

The exclusion for leitende Angestellte concerns a legally defined category. A managerial job title alone does not establish that the ArbZG is inapplicable. §18 ArbZG sets out the relevant exclusions and special arrangements. Einzelnorm

Employer Responsibilities: From Planning to Follow-Up

Record Actual Hours and Address Scheduling Problems

The Federal Labour Court’s decision of 13 September 2022, 1 ABR 22/21, identifies an employer obligation to record daily working time under §3(2)(1) Arbeitsschutzgesetz, subject to the scope explained in the judgment. A planned rota alone does not show the hours actually worked. Das Bundesarbeitsgericht

The BMAS recording FAQ explains that recording can be delegated, while employer responsibility remains. It currently describes no prescribed format and permits handwritten records. This is official explanatory guidance, rather than a separate legislative requirement. BMAS

For implementation detail, see Working Time Recording in Germany: What HR Must Do.

A practical management process is to:

  1. Identify the applicable framework: employee scope, sector rules and relevant agreements.

  2. Check the proposed schedule: actual work, breaks, daily rest and averaging.

  3. Consider additional employment: include relevant hours worked elsewhere.

  4. Record actual hours: establish a clear process for corrections and reporting missed breaks.

  5. Review recurring problems: adjust workloads or schedules where excessive hours repeatedly occur.

  6. Escalate uncertain arrangements: obtain appropriate input before relying on an exception.

For responsibilities beyond scheduling, see Employer Obligations in Germany: HR Compliance Checklist.

GCI’s Employment Law & HR Obligations in Germany course helps HR professionals and managers connect working-time requirements, rest rules and employee representation with everyday workplace decisions. germancomplianceinstitute.com

Six-step employer workflow for checking schedules, recording actual hours and addressing working-time problems.

Involve the Works Council Where Required

Where a Betriebsrat exists, §87 BetrVG provides co-determination rights concerning matters including daily start and finish times, breaks, distribution across weekdays and temporary changes to normal working time, subject to its statutory qualifications.

Relevant recording technology can also trigger participation rights. Involve the council before implementing changes where those rights apply. Einzelnorm

Competent state occupational safety authorities oversee working-time compliance. The response to a breach depends on the applicable provision and circumstances; a fine is not automatic. bmas.de

Build Working Schedules Around the Applicable Rules

Reliable scheduling brings together agreed hours, actual work, breaks, rest and the relevant legal framework. Check these elements before approving a rota, then use actual records to identify where working practice differs from the plan.

Early review gives HR and managers more room to correct scheduling problems before they become recurring workplace disputes.

Tags:

Frequently Asked Questions

01 Does Germany Have a Mandatory 40-Hour Working Week? +

No. Contractual full-time hours vary. A 40-hour agreement is different from the statutory framework governing maximum work, breaks and rest. Check the employment terms and applicable collective arrangements alongside the legal limits.

02 Can Employees Work 60 Hours in One Week? +

Potentially, under the ordinary six-day framework, but only where the relevant daily limits and averaging conditions are satisfied. Breaks, rest, contractual arrangements and any special rules remain important. A temporary longer week should not be treated as permission for a permanent 60-hour schedule.

03 Can an Employee Work Exactly Six Hours Without a Break? +

Under the ordinary adult rule in §4 ArbZG, exactly six hours does not trigger the statutory 30-minute break requirement. Working beyond six hours changes the position. Agreements may provide more generous breaks, and young workers have different statutory protections.

04 Is Saturday a Working Day in Germany? +

Saturday generally belongs to the statutory Werktag framework. That does not mean every employee must work Saturdays. Whether Saturday forms part of someone’s schedule depends on their applicable employment arrangements.

05 Can a Four-Day Week Include Four Ten-Hour Days? +

It may be possible, but the arrangement needs assessment. Ten hours of actual work requires at least 45 minutes of qualifying breaks, and the employer must also check averaging, uninterrupted rest, contractual arrangements and any applicable special rules. A four-day label does not establish compliance.

06 Do Working-Time Rules Apply to Small Employers? +

A small workforce does not itself create a general exemption from the ArbZG. Scope depends on the relevant employee category and statutory provisions. Employers should assess the arrangement rather than assume that a small business, startup or informal workplace falls outside the rules.